Story thread · 3 reports / 2 sources
PJM drops Oklo advanced nuclear project from interconnection study cycle
utilitydive.com · 14d
Oklo asked the Federal Energy Regulatory Commission to order the PJM Interconnection to reinstate its 750-MW, mixed-technology project. PJM reportedly told Oklo that it never showed the project could ride through a sudden drop in grid voltage.
First report: Oklo vs. X-Energy: Which One Actually Produces Nuclear Power First? — finance.yahoo.com, 16d
The conversation · 0
Sign in to join the conversation.
No comments yet — start the thread.