Story thread · 7 reports / 7 sources
LiteOn teams with Wolfspeed on 800VDC power systems for AI data centers
digitimes.com · 18h

How the coverage leans
Across 7 sources · syndicated copies counted once
LiteOn Technology plans to begin trial production of its 800V high-voltage direct current (HVDC) solutions in August as it prepares to scale next-generation power systems for AI data centers.
First report: HD Hyundai Heavy wins 956 bln-won engine generator supply deal in U.S. — en.yna.co.kr, 1d
The coverage
- HD Hyundai wins $674 million U.S. data center power deal
upi.com · 23h
- Hyundai Heavy Industries signs 1GW natural gas engine supply deal with unnamed US data center developer
datacenterdynamics.com · 1d
The conversation · 0
Sign in to join the conversation.
No comments yet — start the thread.