Story thread · 2 reports / 2 sources
In pictures: ITER tokamak core assembly progressing
world-nuclear-news.org · 11d
The sixth of nine tokamak sector modules has been installed in the ITER tokamak pit, almost six months ahead of schedule. The final sector is scheduled to be installed in about a year's time.
First report: World’s largest tokamak ITER installs 1,100-ton core module to confine fusion plasma — interestingengineering.com, 12d
The conversation · 0
Sign in to join the conversation.
No comments yet — start the thread.